Pass theLeben in Deutschland& Einbürgerungstest.
Train with official BAMF-style questions, realistic 33-question exam simulation, and offline study on iOS and Android.

App Interface Overview




















Smart Readiness Score.
Stop guessing. The app analyzes your progress to tell you exactly when you're ready to pass.
- Real-time pass probability
- Weakness identification
- Category-based breakdown

Practice Like the Real Test.
Train with confidence. Our exam mode matches the official test format perfectly: 60 minutes, 33 questions.
- Official strict 60-min timer
- 33 Questions (30 General + 3 State)
- Auto-grading system
- Review incorrect answers

Understand Every Question.
Switch instantly between 8+ languages to understand difficult terms without losing focus.
- 8+ Instant translations
- Contextual explanations
- Searchable question bank
- Bookmark difficult terms

Detailed Results & Insights.
Don't just pass or fail. Understand why. Review every answer with detailed explanations.
- Instant grading
- Detailed explanations
- Review incorrect answers
- Track improvement over time

Study Smarter, Not Harder.
The official test is strict. We built a tool that handles the rules for you, so you can focus on learning.
Master the Time Limit
The real test is strictly 60 minutes.
33 Random Questions
You never know which questions you'll get.
Your Federal State
3 questions are specific to where you live.
Instant Feedback
Official tests take weeks to grade.
"Simply the best way to prepare."
Real feedback from the people who matter.
I was actually dreading this test. The app made it feel like a game. I passed with 33/33, but honestly, I just enjoyed learning the history.
Finally, an app that respects my time. Clear layout, zero noise, and exactly what I need to study every day.
My German isn't perfect, so the translations were a lifesaver. Memorizing 300 questions felt impossible before I found this app.
I didn't just memorize answers; I actually learned a lot about Germany. The explanations gave me so much context on German history and politics. It made the whole thing genuinely interesting.
A complete study app. For everyone.
Start free with official questions and realistic exam practice. Upgrade once for deeper explanations, smart tagging, and advanced progress insights.
Unlock Premium
Premium helps you study more efficiently with clear explanations, smart organization, and better visibility into weak areas.
- Unlimited exam simulations
- Detailed category analytics
- Weakness tracking
- Unlimited bookmarks and tags
- In-depth explanations

Common Questions
Is this the official test catalog?
Yes. We source our questions directly from the BAMF (Federal Office for Migration and Refugees) official catalog. The questions you practice here are identical to the ones in your exam.
Does it include all federal states?
Yes. During the initial setup, you select your specific Bundesland (e.g., Berlin, Bayern, Hessen). Each mock exam follows the official structure: 33 questions total, including 30 general questions and 3 state-specific questions.
Is an internet connection required?
No. LiDPrep is an offline-first application. All data, including images and translations, is stored locally on your device. You can study anywhere without using mobile data.
Is this app useful for Einbürgerungstest preparation?
Yes. LiDPrep is built for Leben in Deutschland and Einbürgerungstest preparation with official-format practice, state-specific questions, and readiness tracking.
Study Guides
Explore focused guides for Leben in Deutschland and Einbürgerungstest preparation.
Leben in Deutschland Test
Official-format overview of the 33-question test and how to prepare effectively.
Einbürgerungstest Fragen
How the questions are structured, what to expect, and how to practice efficiently.
Einbürgerungstest App
Compare app-based preparation benefits and pick a study flow that fits your schedule.